General Road Repairs and Maintenance
Parish | Road Section | Project Type | Road Type | Status |
---|---|---|---|---|
St. Catherine | Spanish Town – Bamboo; Upper – Lower Homestead; Bog Walk – Fletcher’s Street; Vanity Fair – Tavern Hill; Gutters – Free Town | Patching | NWA | 40% |
St. Catherine | All Constituencies | Periodic Maintenance | NWA | 80% |
St. Catherine | Augustus Drive | Road Rehabilitation | Parish Council | Pending |
St. Catherine | Avenue; Vanity Fair- | Patching | NWA | 98% |
St. Catherine | Barrett Street | Periodic Maintenance | NWA | Pending |
St. Catherine | Barry Road; Frazer’s Boulevard Drain; Main Drain (Spanish Town – Bamboo); Bog Walk By-Pass; Magazine Lane; Darlington Drive; Old Harbour Bay Drains; Big Pond (Old Harbour – Bartons); Lime Tree Drain (Spanish Town – Port Henderson); Sydenham Villas Drain; | Periodic Maintenance | NWA | 97% |
St. Catherine | Bog Walk | Periodic Maintenance | Parish Council | Pending |
St. Catherine | Bog Walk to Barry | Periodic Maintenance | NWA | Pending |
St. Catherine | Bog Walk to Ewarton | Periodic Maintenance | NWA | Pending |
St. Catherine | Bog Walk to Natural Bridge | Periodic Maintenance | NWA | Pending |